Configuration to Version 4.5

Editing assignments

To assign a meter point to a cost center or an energy benefit, proceed as follows:

  1. Go to Acquisition > Project > Cost centers.
  2. In the 'Assignments' area, click on the  symbol.
  3. Select a meter point. You can do so from the meter point list.
  4. As long as haven't assigned 100% yet, you can add additional assignments.

Note

Calculated meter points (totals / differences balancing group) can only be selected from the list.